Reference specification

Model: AS-8126GS-NB3RT-01-G2. NVIDIA HGX B300 8-GPU. CPU: Dual AMD EPYC 9575F, 128 cores total, 3.3 GHz. Host memory: 3 TB (24 × 128 GB) DDR5-6400. Storage: 61.44 TB total flash storage. Networking: 8-port XDR800 or 16-port 400GbE plus 2-port NDR200.

What the reference does and does not include

This specification follows the supplier reference supplied to GrowX on 5 October 2026. It is an example for a made-to-order enquiry, not a current-stock allocation. The orderable SKU, drive layout, usable capacity, adapter implementation, optics, cables and service scope require confirmation in the final quotation.

Prepare the receiving site

Provide the final deployment country and receiving facility. Ask your technical team to verify the proposed chassis, rack, power input and cooling against manufacturer documentation. Confirm service entitlement for the final operator and location.

Request this model or an approved alternative

Include AS-8126GS-NB3RT-01-G2, server quantity, required changes, company, end user and target date. Explain whether the reference storage and network options match your workload. GrowX will review the exact BOM and supply feasibility before confirming price, payment terms or delivery.

Plan your Asian deployment

Choose the actual installation market. Sourcing, technical suitability and supply eligibility are assessed for the buyer, end user and destination.

  • United States: Request a dated allocation check for the exact system BOM, condition and quantity; a spot option is not a live inventory claim.
  • United Arab Emirates: Name the applicant, beneficiary, proposed bank and documentary requirements for commercial review.
  • Mainland China: Disclose the actual operator, final installation and intended use before discussing supply.
  • Singapore: Identify the operating company separately from the regional purchasing headquarters.
  • Malaysia: Identify the actual receiving facility, including the deployment city and rack readiness date.
  • Indonesia: State the receiving city and facility; distinguish international delivery from onward domestic transport.
  • Thailand: Separate the integrator purchasing the equipment from the company operating it.
  • Vietnam: Identify the buyer, importing entity and ultimate operating company.
  • Japan: Provide the exact platform part number and the receiving facility’s electrical and cooling specifications.
  • South Korea: Identify the operator and end-user workload rather than providing only a trading-company address.
  • Taiwan: Distinguish complete-server procurement from component sourcing or manufacturing enquiries.
  • India: State explicitly that this is an India end-use project; supplier inspection in India is a separate requirement.
  • Philippines: Specify the final facility and the complete domestic delivery route, not just an arrival port.
  • Hong Kong: Distinguish deployment in Hong Kong from warehouse receipt for a different destination.

Mainland China procurement information

Send your procurement brief

Include the equipment list, quantity, destination and responsible purchasing contact. Request a private channel for sharing your BOM or supporting documents.

Discuss on WhatsApp

Prepare an email request · WeChat

Related procurement options

Payment, inspection and supply options